Possible online services disruption due to Internet related outage
Public Notices
- Public Notice: Proposed Construction, Operation and Maintenance of Big Bend Dams in Whiteside County - Proposed construction, operation and maintenance of Big Bend Dams in Whiteside County. Comments will be accepted through November 4, 2024.
- Public Notice: Proposed Improvements of Riverfront Park on the Fox River in the Village of Carpentersville - Proposed improvements of Riverfront Park on the Fox River in the Village of Carpentersville. Comments will be accepted through November 7, 2024.
- Public Notice: Proposed Construction, Operation and Maintenance of Ursa Wastewater Treatment Lagoon Dams in Adams County - Proposed construction, operation and maintenance of Ursa Wastewater Treatment Lagoon Dams in Adams County. Comments will be accepted through November 8, 2024.
- Public Notice: Proposed Bridge Replacement of US6/IL71 over the Fox River in LaSalle County - Proposed bridge replacement of US 6/IL 71 over the Fox River in LaSalle County by IDOT. Comments will be accepted through November 16, 2024.
- Public Notice: Modification of an Existing Barge Terminal in the Mississippi River (Approximately between River Miles 176.1 and 176.7) in St. Clair County - An application for permit has been received. The applicant requests authorization for a modification of an existing barge terminal. Comments will be accepted through December 1, 2024.
Lists of applications-for-permits currently under review by the Chicago, Bartlett, and Springfield Offices are available on the Permit Programs page.
If a Notice is unavailable, please contact the Webmaster. Notice downloads are automatically disabled once the comment period has ended.